Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Newport Beach, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Newport Beach

Check your roll-off size: 30-yard for C&D debris, 40-yard for contractor swap-outs with same-day runs and driveway boards included.

Jobsite Roll-off Containers for General Contractors

Our construction fleet runs 20-, 30-, and 40-yard roll-offs across the Newport Beach metro and Orange; these heavy-duty containers feature reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews. We set every unit on protective driveway boards. We offer contractor pricing and tonnage rates for recurring hauling agreements on large, multi-phase projects.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Newport Beach, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

The 20-yard roll-off measures 20 feet long, 7 feet wide, and 4 feet tall, with about 2 tons included for your construction debris.

This 20-yard container fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Newport Beach, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons included for your project.

The 30-yard container handles whole-house remodels, additions, and new-build framing with high walls for bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Newport Beach

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long, 8 feet wide, and 8 feet tall, with about 5 tons included for the haul.

Sized for commercial builds and large tear-outs, the 40-yard roll-off is the largest container we stage on jobs.

Construction Debris, Drywall, Lumber Acceptance

Our construction roll-off accepts a wide range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. Materials are sorted at the Newport Beach transfer station—maximizing recovery before the remainder heads to landfill. Many contractors setting up commercial recurring hauling agreements follow EPA construction debris recycling guidance to streamline their project site waste streams. Get pricing — (949) 828-5463.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Newport Beach, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Newport Beach, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials demand a heavier-duty container. Our reinforced-steel lowboy roll-offs are built for concrete slab tear-out, brick demo, asphalt millings, and clean dirt loads up to 10,000 pounds per pull. The low 2-to-3-foot side walls let a skid steer or wheelbarrow roll right over the rim without busting USDOT truck weight limits on Newport Beach routes.

Heavy-debris jobs run on weight tickets from the scale house, not on the yard; the cleanest loads — with no mixed wood, drywall, or trash — earn the lowest per-ton rate. I coordinate your container based on a quick call with the site super, and that determines the total tonnage for the dumpster.

Tonnage Limits and Weight Overage Policy

Every Construction Roll-Off includes a fixed tonnage allowance: you pay a flat rate for that weight. Overage is billed per-ton based on the scale-house ticket; this is stated on your upfront quote so there are no surprises when the truck weighs in. For a heavy roofing tear-off jobsite containers—these act as a separate use-case—shingles run heavy and should not exhaust your mixed-debris allowance.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap rhythm, not a single drop; text or call dispatch when a container’s full — we’ll drop a fresh roll-off to the same staging pad on the same or next business day across Newport Beach and Orange.

Step 1

Text dispatch when full

Site supers text a photo of debris plus the container number to the dispatcher — no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul the full container and drop an empty one on the same pad so your crew never loses a loading hour.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; coordinate Friday afternoon.

Insurance and Contractor Account Setup

Certificates of insurance go out to the GC or owner before the first hooklift rolls; that means contractor accounts can run net-30 with consolidated monthly billing across your Newport Beach active sites — which is why the dispatcher books recurring bins the same call that spins up the account.