Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Newport Beach, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Newport Beach

A 30-Yard Roll-Off keeps most Newport Beach kitchen and bath remodels clean. Call (949) 828-5463 for swap-outs and driveway boards.

Jobsite Roll-off Containers for General Contractors

Our construction fleet runs 20-, 30-, and 40-yard roll-offs across the Newport Beach metro and Orange; these containers feature reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews to load safely. We set every bin on protective driveway boards. For multi-phase projects, call us regarding contractor pricing and tonnage rates.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Newport Beach, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

The 20-yard roll-off measures 20 feet long, 7 feet wide, and stands 4 feet tall, with about 2 tons of debris included.

This 20-yard roll-off fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Newport Beach, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons of capacity included.

The 30-yard container fits whole-house remodels, additions, and new-build framing with high walls to handle bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Newport Beach

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long by 8 feet wide and stands 8 feet tall, with about 5 tons of debris included.

Sized for commercial builds and large tear-outs, the 40-yard roll-off is the largest container for multi-phase jobs.

Construction Debris, Drywall, Lumber Acceptance

Our construction roll-off containers accept the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals. Material is sorted at the Newport Beach transfer station to maximize recovery — contractors on active sites often manage this via commercial recurring hauling agreements. Reviewing official EPA construction debris recycling guidance helps keep your projects compliant with standard waste management practices.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Newport Beach, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Newport Beach, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense materials need the right roll-off. Our reinforced-steel lowboy roll-offs are built for concrete slab tear-out, brick demo, asphalt millings, and clean dirt loads up to 10,000 pounds in a single haul. The low 2-to-3-foot side walls let skid steers and wheelbarrows dump straight in without pushing us over USDOT truck weight limits on Newport Beach streets.

Heavy debris jobs run on weight tickets from the scale house, not by the yard; the cleanest loads—those with no mixed wood, drywall, or trash—earn the lowest per-ton rate. I set the container size and handle dispatching after a quick call with your site super to discuss the expected tonnage.

Tonnage Limits and Weight Overage Policy

Every construction roll-off ships with an included tonnage allowance included in your upfront quote. Additional weight is billed at our per-ton overage rate against the scale-house ticket: that way, there are no surprises when the truck weighs in. We treat the container differently for a roofing tear-off jobsite containers; shingles run heavy—which is why we track that load separately to protect your allowance.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap-out rhythm, not single drops; text or call dispatch when a container is full — we’ll roll a fresh roll-off to the same staging pad on the same or next business day across the Newport Beach metro and Orange.

Step 1

Text dispatch when full

Site supers text the dispatcher a photo and the container number — no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul your full container and drop an empty on the same pad—no minutes lost loading because the hooklift swap takes under two minutes.

Step 3

Weekend dispatch available

Saturday pull-offs clear the deck so Monday starts sharp; coordinate Friday afternoon.

Insurance and Contractor Account Setup

Certificates of insurance go out to the GC or owner the same day; the hooklift fleet stages recurring containers across active sites in Newport Beach. We run net-30 contractor accounts with consolidated monthly billing — that means one phone call with dispatch spins up the account and gets the bin placed.